e-ART, Buses and the RTS: What Is Really Happening to JB Traffic | 新山交通的真实进展:e-ART、巴士与RTS
· Malaysia Home Finder
Johor Bahru has three transport plans at very different stages: the RTS Link, which is built and being tested; an RM10 billion elevated transit system that has Cabinet approval but no signed contract; and a bus expansion that is already funded. Knowing which is which tells you how much weight to put on any of them when you buy.新山目前有三项交通计划,进度差别很大:RTS Link已经建好、正在测试;一套造价100亿令吉的高架捷运系统已获内阁批准,但还没签合约;还有一项已经获得拨款的巴士扩充计划。分清楚哪个是哪个,你在买房时就知道该给每一项多少分量。
Last checked: 14 Oct 2026.最后核对:2026年10月14日。
RTS Link — built, testing, opening February 2027RTS Link —— 已建好、测试中,2027年2月通车
Passenger service is now expected in February 2027, moved from January under a joint statement by Singapore’s Land Transport Authority and Malaysia’s Ministry of Transport on 2 October 2026. Transport Minister Anthony Loke described February as a buffer rather than a delay. Full detail is in our RTS Link facts page.载客服务目前预计在2027年2月开始,比原定的1月推迟。这是新加坡陆路交通管理局与马来西亚交通部在2026年10月2日联合文告中宣布的。交通部长陆兆福形容2月是缓冲期,而不是延误。完整资料见我们的RTS Link事实页面。
Official specifications, from MRT Corp: 4 km total, two stations (Bukit Chagar and Woodlands North), about 6 minutes station to station, and 10,000 passengers per hour in each direction.MRT Corp公布的官方规格:全长4公里,两个车站(Bukit Chagar与Woodlands North),站到站约6分钟,每方向每小时10,000名乘客。
Fares are still not announced. Figures of around RM15 to RM22 have circulated, but the minister described these as reflecting commercial principles, not an official fare. Treat any fare you see quoted as unconfirmed.票价尚未公布。坊间流传约RM15至RM22的数字,但部长表示那只是反映商业原则,并非官方票价。看到任何票价,都应当作未经证实。
One point often got wrong: Bukit Chagar station has its own immigration hall. RTS passengers clear there and do not pass through Bangunan Sultan Iskandar at all. So walking to the CIQ and walking to the RTS are two different journeys.一个常被搞错的重点:Bukit Chagar车站有自己的通关大厅。RTS乘客在那里通关,完全不需要经过苏丹依斯干达大厦(关卡)。所以,走到关卡和走到RTS,是两段不同的路程。
Want to live near the RTS?想住在RTS附近?
We measure the walk and drive to the RTS and CIQ for every project.每个项目到RTS与关卡的步行与车程,我们都实测过。
e-ART — approved, funded in principle, not yet contractede-ART —— 已批准,原则上有资金,但还没签约
The e-ART is an Elevated Autonomous Rapid Transit system: trackless, rubber-tyred articulated vehicles running on a dedicated elevated guideway. It is not a railway.e-ART是Elevated Autonomous Rapid Transit(高架自动快速交通系统):无轨、胶轮的铰接式车辆,在专用高架导轨上行驶。它不是铁路。
What is confirmed:已确认的部分:
- RM10 billion, approved by Cabinet, announced by the Transport Minister on 17 May 2026.100亿令吉,内阁批准,交通部长于2026年5月17日宣布。
- Roughly RM350 million per kilometre, excluding land acquisition, with the final figure depending on the alignment.每公里约3.5亿令吉,不含征地费,最终数字视路线而定。
- Funded through a public-private partnership, outside the normal ministry tender process. The government funds part; the split has not been disclosed.以公私合作(PPP)模式推行,不走一般的部门招标程序。政府承担部分资金,比例未公布。
- A letter of intent was issued in May 2026 to a consortium of DOM Industries, MMC Engineering, BTS Group of Thailand, and Nylex.2026年5月已发出意向书,对象是DOM Industries、MMC Engineering、泰国BTS Group与Nylex组成的联营体。
- Build time is four years from the letter of acceptance.工期为自接受书起四年。
- Budget 2027, tabled on 9 October 2026, endorsed e-ART as the main solution for JB congestion — but gave no allocation figure.2027年财政预算案(2026年10月9日提呈)确认e-ART为解决新山交通拥堵的主要方案,但没有列出拨款数字。
What is not confirmed: there is no letter of award and no signed concession agreement, so there is no construction start date and no opening year. An earlier state-level scope from May 2024 described 32 stations over more than 50 km across three lines — Iskandar Puteri, Skudai and Tebrau — but that was before Cabinet approval and may have been superseded.尚未确认的部分:还没有中标书,也还没签特许经营合约,因此没有动工日期,也没有通车年份。2024年5月州政府曾提出32个车站、超过50公里、三条路线(依斯干达公主城、士古来、地不佬)的方案,但那是在内阁批准之前,可能已被取代。
In short: real, approved, and still some way from a spade in the ground.简单说:计划是真的、已获批准,但距离动工还有一段路。
BRT — shelved, despite what some listings still sayBRT —— 已搁置,尽管部分广告仍在提
The Iskandar Malaysia BRT, planned from 2016, was dropped. The state committee found it could not ease congestion because about 13.79 km, roughly a quarter of the route, would have shared lanes with ordinary traffic. If you see a project advertised as being on a future BRT line, that line was cancelled.2016年规划的依斯干达大马BRT已被取消。州委员会发现它无法纾解拥堵,因为约13.79公里(接近四分之一路段)需要与一般车流共用车道。如果你看到某个项目宣传”未来BRT沿线”,那条路线已经取消了。
Buses — the part that is actually funded and dated巴士 —— 真正已拨款、有日期的部分
This is the least glamorous item and the most certain. All announced by the Transport Minister on 8 October 2026:这一项最不起眼,却最确定。以下均由交通部长在2026年10月8日宣布:
- BAS.MY Johor Bahru extended five years from 2027, with 230 new buses.BAS.MY新山自2027年起延长五年,新增230辆巴士。
- Main-route headways of 15 to 20 minutes, feeder routes 20 to 30 minutes.主线班次间隔15至20分钟,接驳线20至30分钟。
- 20 extra bus bays on Jalan Jim Quee, and new routes to Tiram Terminal, Johor Jaya, Eco Tropics, Mall of Medini and UTM.Jalan Jim Quee增设20个巴士停泊位,并新增通往Tiram总站、Johor Jaya、Eco Tropics、Mall of Medini和UTM的路线。
- The network currently carries close to one million passengers a month.该网络目前每月载客接近100万人次。
- RM60 million for direct access so KTM Komuter passengers can reach the RTS station without leaving JB Sentral.6,000万令吉用于兴建直通通道,让KTM通勤列车乘客无需离开JB Sentral即可抵达RTS车站。
Separately, Johor’s exco chairman said in September 2026 that pedestrian overhead bridges linking Bukit Chagar to JB Sentral, City Square and Komtar JBCC are being built in phases, with most ready by the end of 2026 and the rest in 2027. Jalan Jim Quee closes to private vehicles from 2027.另外,柔佛州行政议员在2026年9月表示,连接Bukit Chagar与JB Sentral、City Square和Komtar JBCC的行人天桥正分期兴建,大部分预计在2026年底完成,其余在2027年。Jalan Jim Quee将自2027年起禁止私家车通行。
What this means when you are choosing a project选项目时,这些资讯怎么用
- Build on the RTS. It is physically finished and in testing. A project’s distance to Bukit Chagar is a real, measurable fact today.可以放心把RTS纳入考量。它已实体完工并在测试中。项目到Bukit Chagar的距离,是今天就能量度的事实。
- Treat e-ART as a possibility, not a feature. No contract is signed. If a sales pitch prices in an e-ART station near a project, ask to see the alignment — it has not been published since Cabinet approval.把e-ART当成可能性,而不是卖点。合约尚未签订。如果销售说法把某个e-ART车站算进项目价值,请要求看路线图——内阁批准后并未公布路线。
- Check the bus routes, especially for projects outside the city centre. The new BAS.MY routes are dated and funded.查清楚巴士路线,尤其是市中心以外的项目。新的BAS.MY路线有明确日期和拨款。
- No Malaysian government body forecasts property prices from these projects. The demand arguments you read in the press come from private research firms. We quote those as their view, not as fact.没有任何政府机构根据这些工程预测房价。你在媒体上看到的需求论述,来自私人研究机构。我们引述时会说明那是他们的看法,而不是事实。
Projects on the corridors being improved位于改善走廊上的项目
Monterra @ Solaris Tebrau
New launch in Tebrau with dual-key layouts and 10 units per floor
- Price价格
- RM4XXK to RM6XXK≈ S$1XXK to S$1XXK
- Completion完工
- End of 2029
- Layouts户型
- 1 Bedroom, 2 Bedrooms, 3 Bedrooms, Dual-key
- Access交通
- Tebrau, Johor Bahru (Jalan Kunyit); within about 10km of the CIQ and RTS
- Foreigners外国买家
- From RM500KRM500K 起
Why we recommend this project here推荐理由
Tebrau, one of the corridors in the earlier e-ART scope. Completion end 2029, leasehold, RM4XXK to RM6XXK.地不佬,属早期e-ART方案中的走廊之一。2029年底完工,租赁地契,RM4XXK至RM6XXK。
M Grand Minori @ Taman Pelangi
Mah Sing freehold serviced apartments in Taman Pelangi with a planned CIQ/RTS shuttle, studios to dual-key
- Price价格
- RM3XXK to RM8XXK≈ S$9XK to S$2XXK
- Completion完工
- Q3 2030
- Layouts户型
- 1 Bedroom, 3 Bedrooms, Dual-key, Studio
- Access交通
- RTS Bukit Chagar: about 3.8 km by road (measured on OpenStreetMap routes, Oct 2026)
- Foreigners外国买家
- From RM500KRM500K 起
Why we recommend this project here推荐理由
Close to the city centre. Completion Q3 2030, freehold, RM3XXK to RM8XXK.靠近市中心。2030年第三季完工,永久地契,RM3XXK至RM8XXK。
Larkinton @ Adison (WCity Larkin)
Freehold studios and 2-bedroom serviced apartments by WCT in Larkin
- Price价格
- From RM3XXK≈ from S$9XK
- Completion完工
- 2028
- Layouts户型
- 2 Bedrooms, Studio
- Access交通
- RTS Bukit Chagar: about 9.2 km by road (measured on OpenStreetMap routes, Oct 2026)
- Foreigners外国买家
- From RM400KRM400K 起
Why we recommend this project here推荐理由
Larkin, near the main bus terminal. Completion 2028, freehold, from RM3XXK.拉庆,邻近主要巴士总站。2028年完工,永久地契,从RM3XXK起。
KSL Ceros Residences @ Nusa Idaman
Freehold Iskandar Puteri apartments near the Second Link, with a KSL City Mall shuttle
- Price价格
- RM2XXK to RM6XXK≈ S$6XK to S$1XXK
- Completion完工
- Q4 2027
- Layouts户型
- 1 Bedroom, 2 Bedrooms, 3 Bedrooms, Studio
- Access交通
- About 5km to the Second Link Expressway; shuttle bus to KSL City Mall (per developer)
- Foreigners外国买家
- From RM400KRM400K 起
Why we recommend this project here推荐理由
Iskandar Puteri, another corridor in the earlier scope. Completion Q4 2027, freehold, RM2XXK to RM6XXK.依斯干达公主城,同样属早期方案中的走廊。2027年第四季完工,永久地契,RM2XXK至RM6XXK。
Frequently asked questions常见问题
When does the RTS open?RTS几时通车?
February 2027, per the joint statement of 2 October 2026. The infrastructure is substantially complete and in testing.2027年2月,根据2026年10月2日的联合文告。基建已大致完成,正在测试。
How much will the RTS cost to ride?RTS票价多少?
Not announced. Figures circulating have not been confirmed by either government.尚未公布。流传的数字未获两国政府证实。
Is the ART confirmed?ART确定了吗?
Cabinet has approved RM10 billion and a letter of intent has been issued, but there is no letter of award or signed concession agreement, so there is no construction start date.内阁已批准100亿令吉并发出意向书,但尚未发出中标书或签署特许经营合约,因此没有动工日期。
Where will the ART run?ART会经过哪里?
The route is not confirmed. A May 2024 state plan described three lines covering Iskandar Puteri, Skudai and Tebrau, but that predates Cabinet approval.路线尚未确定。2024年5月的州政府方案提出三条路线,涵盖依斯干达公主城、士古来和地不佬,但那是在内阁批准之前。
What happened to the BRT?BRT后来怎么了?
It was shelved. The state found that about a quarter of the route would have shared lanes with traffic, so it would not have eased congestion.已搁置。州政府发现约四分之一的路段需与车流共用车道,无法纾解拥堵。
Talk to us联络我们
Want to know how a project actually connects — on foot, by bus and by rail? WhatsApp us and we will go through the measured routes with you.想知道某个项目实际上怎么连接——走路、搭巴士、搭铁路?欢迎WhatsApp我们,一起看量度过的路线。
Sources: LTA and Ministry of Transport joint statement, 2 October 2026; MRT Corp (mymrt.com.my/rts); The Star, 17 May 2026 and 17 May 2024; The Edge, 2 July 2026; Bernama, 8 October 2026; The Star, 19 September 2026; Budget 2027 coverage, 9 October 2026.资料来源:新加坡陆交局与马来西亚交通部联合文告,2026年10月2日;MRT Corp(mymrt.com.my/rts);《星报》2026年5月17日及2024年5月17日;《The Edge》2026年7月2日;马新社2026年10月8日;《星报》2026年9月19日;2027年财政预算案报道,2026年10月9日。