River Park is a condominium of 3 towers and 1,332 units on 5.10 acres off Jalan Pantai Dalam, beside Angkasapuri, marketed as River Park @ Bangsar South. The official name is Residensi Taman Hilir. The developer is Kumpulan Gapadu Sdn Bhd, a subsidiary of Malton Berhad. It is 99-year leasehold to July 2118, on residential title. Layouts are 2 and 3 bedrooms, 812 to 1,180 sq ft, with 2 car park bays for most units. Gross prices on the permit run from RM7XXK to RM1.2mil. The structure topped out in August 2025, and the permit gives expected completion of October 2027 (Tower B) and December 2027 (Towers A and C). About a 300 m pedestrian walkway to Angkasapuri KTM station.River Park 是位于 Jalan Pantai Dalam、Angkasapuri 旁的公寓项目,共3栋、1,332个单位,占地5.10英亩,以 River Park @ Bangsar South(南孟沙)名义推广,正式名称为 Residensi Taman Hilir。发展商为 Malton Berhad 旗下的 Kumpulan Gapadu Sdn Bhd。99年租赁地契,至2118年7月,住宅地契。户型为2房和3房,812至1,180平方尺,大部分单位配2个停车位。准证毛价为 RM7XXK 至 RM1.2mil。主体结构已于2025年8月封顶,准证所列预计完工日期为2027年10月(B座)和2027年12月(A座与C座)。有300米行人通道通往 Angkasapuri KTM站。
Key Facts 项目资料
| Price价格 | RM7XXK to RM1.2mil (gross, permit band)RM7XXK 至 RM1.2mil(准证毛价区间) |
| Nearest rail最近轨道交通 | Angkasapuri KTM: about a 300 m pedestrian walkwayAngkasapuri KTM站:有300米行人通道 |
| Tenure地契 | 99-year leasehold, expiring 28 July 211899年租赁地契,至2118年7月28日 |
| Title地契类别 | Residential (condominium)住宅地契(公寓) |
| Type类型 | Condominium, 3 towers of 46 to 47 storeys, 12 units per floor公寓,3栋46至47层,每层12个单位 |
| Built-up面积 | 812 to 1,180 sq ft812至1,180平方尺 |
| Completion完工 | Expected October 2027 (Tower B) and December 2027 (Towers A and C), per the permit按准证,预计2027年10月(B座)与2027年12月(A座与C座) |
| Status状态 | Under construction; structure topped out in August 2025建造中;主体结构于2025年8月封顶 |
| Total units单位总数 | 1,332 (Tower A 440, Tower B 452, Tower C 440)1,332(A座440、B座452、C座440) |
| Land土地面积 | 5.10 acres5.10英亩 |
| Car park停车位 | 2 bays per unit (developer; some 3-bedroom units 3)每单位2个(发展商;部分3房单位3个) |
| Maintenance管理费 | About RM0.35 psf, including sinking fund (developer)约每平方尺RM0.35,含偿债基金(发展商) |
| Foreign buyers外国买家 | Foreign buyers: WhatsApp to know more about this project.外国买家:欢迎WhatsApp了解本项目详情。 |
| Developer发展商 | Kumpulan Gapadu Sdn Bhd (Malton Berhad group)Kumpulan Gapadu Sdn Bhd(Malton Berhad 集团) |
| Developer licence发展商执照 | 14035/02-2029/0042(R), valid to 24 Feb 202914035/02-2029/0042(R),有效期至2029年2月24日 |
| Advertising permit, Towers A & C广告准证(A座与C座) | 14035-4/02-2027/0050(R)-(S), valid 25 Feb 2026 to 24 Feb 202714035-4/02-2027/0050(R)-(S),有效期2026年2月25日至2027年2月24日 |
| Advertising permit, Tower B广告准证(B座) | 14035-5/05-2027/0245(R)-(S), valid 10 May 2026 to 9 May 202714035-5/05-2027/0245(R)-(S),有效期2026年5月10日至2027年5月9日 |
Want the full picture?想了解完整资料?
Price depends on layout, floor and facing. We send the price list, floor plans and unit positions on WhatsApp.价格视户型、楼层与朝向而定。我们会在WhatsApp发送价格表、平面图与单位位置。
Layouts 户型
| Type户型 | Size面积 | Bedrooms / baths房 / 卫 |
|---|---|---|
| A1, A2 | 812 sq ft | 2 beds, 2 baths2房2卫 |
| A3, A4 | 861 sq ft | 2 beds, 2 baths2房2卫 |
| B | 1,180 sq ft | 3 beds, 2 baths3房2卫 |
Floor plans. Tap a plan to enlarge.平面图,点击可放大。





Sizes are built-up from the developer’s brochure. WhatsApp us for unit positions.面积为发展商手册所列建筑面积。单位位置欢迎WhatsApp索取。
Found a layout you like?看中哪个户型了吗?
Prices depend on layout, floor and facing. WhatsApp us for the exact price of the unit you want and the layouts that fit your budget.价格视户型、楼层及朝向而定。WhatsApp我们,了解心仪单位的确切价格及适合您预算的户型。
Get prices for this layout获取此户型价格Highlights 项目亮点
- Residential title, not a serviced apartment on commercial land住宅地契,不是商业地上的服务式公寓
- Family layouts: every unit has at least 2 bedrooms and 2 bathrooms家庭户型:每个单位至少2房2卫
- About a 300 m pedestrian walkway to Angkasapuri KTM, plus a shuttle to MRT, LRT and Mid Valley有300米行人通道到 Angkasapuri KTM站,另有接驳车往返MRT、LRT和谷中城
- Direct road access off the Federal Highway and the New Pantai Expressway (NPE), per the developer可由联邦大道和新班底大道(NPE)直接进出
- Provisional GreenRE certification (developer)已获 GreenRE 临时绿色认证(发展商)
- Fitted kitchen cabinets, hob and hood, air-conditioners, water heater and digital lock (developer spec)厨柜、炉灶与抽油烟机、冷气、热水器和电子锁(发展商规格)
Facilities 设施
Level not published楼层未公布
Facilities设施
- Infinity lap pool and jacuzzi无边际泳池与按摩池
- Gymnasium and therapy room健身房与理疗室
- Library and virtual office图书室与共享办公室
- Games room and indoor kids’ play room游戏室与室内儿童游乐室
- Guarded entrance with a guard house设有门卫亭的保安出入口
Location & Access 地点与交通
- Lot 20036 (Lot PT.8), Seksyen 98, Jalan Pantai Dalam, Kuala Lumpur, beside Angkasapuri. Marketed as Bangsar South; the site is on the Pantai Dalam side吉隆坡 Jalan Pantai Dalam,Seksyen 98 Lot 20036(Lot PT.8),Angkasapuri 旁。以南孟沙名义推广,实际位于 Pantai Dalam 一侧
- Angkasapuri KTM (Port Klang line): about a 300 m pedestrian walkway, covered on selected stretches. We could not measure it: OpenStreetMap does not yet show the new walkway. Abdullah Hukum LRT is about 6 km by road.Angkasapuri KTM站(巴生港线):有300米行人通道,部分路段有遮盖。我们无法实测:OpenStreetMap 尚未显示这条新通道。至 Abdullah Hukum 轻轨站车程约6公里。
- Pantai Permai station on the planned MRT3 Circle Line: about 800 to 900 m. The line is not built yet, and there is no link bridge to it规划中 MRT3 环线的 Pantai Permai站:约800至900米。该线尚未建成,也没有连接天桥
- Abdullah Hukum LRT and KL Sentral are a short drive away; the developer runs a shuttle to MRT, LRT and Mid ValleyAbdullah Hukum LRT站和吉隆坡中环开车不远;发展商提供往返MRT、LRT和谷中城的接驳车
- Road access via the Federal Highway and NPE, with a proposed new exit to Old Klang Road (developer)经联邦大道与NPE进出,另有规划中通往旧巴生路的新出口(发展商)
See it in person亲自去看看
Tell us which day suits you. We meet you at the sales gallery or the nearest station.告诉我们哪天方便,我们在销售展厅或最近的车站与您见面。
Who it suits 适合谁
- Families who want 2 or 3 bedrooms on residential title in the city想要市区住宅地契2房或3房的家庭
- First-time buyers looking at a gross band from about RM7XXK看准证毛价约RM7XXK起的首购族
- People who work in Bangsar South, Mid Valley or KL Sentral在南孟沙、谷中城或吉隆坡中环上班的人
- Buyers who want a near-complete building rather than waiting 3 to 4 years for a new launch elsewhere; River Park completes in about a year想买接近完工的楼盘、不想等4至5年的买家
Things to weigh up 需要考虑的地方
- Completion dates have moved. The developer said Q3 2026 in 2025; the current permit says October to December 2027. Check the date in your SPA完工日期有变。发展商2025年说2026年第三季度;目前准证写2027年10月至12月。请以买卖合约为准
- The station walk is the developer’s figure. We have not measured the walkway yet到车站的距离是发展商的说法,我们尚未实测这条通道
- The site sits beside the KTM railway line. If noise matters, ask us about tower and facing项目紧邻KTM铁路。如在意噪音,欢迎问我们哪座、哪个朝向
- MRT3 Pantai Permai is planned, not built. Do not count on it for nowMRT3 Pantai Permai站仍在规划中,尚未建成,目前不宜作为依据
- A large project of 1,332 units: expect busy lifts and facilities at peak times1,332个单位的大型项目:高峰时段电梯和设施可能较繁忙
- Leasehold to 2118, so about 92 years remain today租赁地契至2118年,目前约剩92年
Like to know more about this project?想了解这个项目的更多详情?
WhatsApp us for layouts, floor plans, prices and viewing times.WhatsApp我们,获取户型、平面图、价格及看房时间。
Ask about this project咨询这个项目FAQ 常见问题
What is the price range of River Park @ Bangsar South? River Park @ Bangsar South 价格范围是多少?
The gross permit band runs from RM7XXK to RM1.2mil. 2-bedroom units sit at the lower end and 3-bedroom units at the top. WhatsApp us for the price of a specific layout.准证毛价区间为 RM7XXK 至 RM1.2mil。2房单位在较低一端,3房单位在较高一端。具体户型价格欢迎WhatsApp询问。
Is River Park freehold? River Park 是永久地契吗?
No. It is a 99-year leasehold expiring on 28 July 2118, on residential title.不是。它是99年租赁地契,至2118年7月28日,住宅地契。
When will River Park be completed? River Park 什么时候完工?
The structure topped out in August 2025. The current advertising permit gives expected completion of October 2027 for Tower B and December 2027 for Towers A and C.主体结构已于2025年8月封顶。目前广告准证所列预计完工日期为:B座2027年10月,A座与C座2027年12月。
How far is the nearest train station? 最近的火车站有多远?
About a 300 m pedestrian walkway to Angkasapuri KTM. We could not measure it yet, because the walkway is not on OpenStreetMap. Abdullah Hukum LRT is about 6 km by road.有300米行人通道到 Angkasapuri KTM站。该通道尚未收录在 OpenStreetMap,故未能实测。至 Abdullah Hukum 轻轨站车程约6公里。
Can foreigners buy at River Park? 外国人可以买 River Park 吗?
Foreign buyers: WhatsApp to know more about this project.外国买家:欢迎WhatsApp了解本项目详情。
Last checked: 15 Oct 2026. Sources: the developer’s sales kit and e-brochure (October 2026 fine print), the developer’s website (riverpark.com.my, malton.com.my), and EdgeProp’s August 2025 topping-out report. Prices are gross permit bands, not a price list.最后核对:2026年10月15日。资料来源:发展商销售资料与电子手册(2026年10月版细则)、发展商网站(riverpark.com.my、malton.com.my),以及 EdgeProp 2025年8月封顶报道。价格为准证毛价区间,并非价目表。
How do you plan to invest?您打算怎么投资?
Each plan needs a different setup. Airbnb usually needs fuller renovation and styling, long-term rental can work with simple furnishing, and co-living is set up room by room. WhatsApp us and we will share what suits this project and your budget.不同的投资方式需要不同的准备:Airbnb通常需要较完整的装修与布置,长租只需简单家具即可,合租(co-living)则按房间规划。欢迎WhatsApp我们,我们会分享适合这个项目和您预算的做法。
Location位置
Open in Google Maps在Google地图打开
Walk to Angkasapuri KTM步行到Angkasapuri KTM站
A 300 m pedestrian walkway to Angkasapuri KTM.300米行人通道到 Angkasapuri KTM站。
Walking directions in Google Maps ↗用Google地图查看步行路线 ↗ · More projects in Bangsar, KL Sentral & Bangsar South孟沙、吉隆坡中环与南孟沙的更多项目 · All Kuala Lumpur projects吉隆坡全部项目