Quick answer快速解答
Pavilion Square KL is a leasehold condo in Johor Bahru. Price band: RM1.3mil to RM5.7mil (about S$4XXK to S$1.7mil). Expected completion: July 2027 (advertising permit).Pavilion Square 吉隆坡是位于新山的租赁地契公寓。价格区间:RM1.3mil至RM5.7mil(约S$4XXK至S$1.7mil)。预计2027年完工。
Last checked 最后核对: Ask us on WhatsApp WhatsApp咨询
Pavilion Square KL is a 67-storey serviced residence tower on Jalan Raja Chulan, Bukit Bintang, across the road from Pavilion Kuala Lumpur. The developer is Armani Hartajaya Sdn Bhd, part of Pavilion Group. The tower has 960 units, from 504 sq ft studios to 1,272 sq ft 2+1 bedroom units, and a 118 m sky pool on Level 67. The land is a 99-year lease to 2122. Permit prices run from RM1.3mil to RM5.7mil. The permit gives July 2027 for completion.Pavilion Square KL 是位于武吉免登 Jalan Raja Chulan 的67层服务式住宅,就在柏威年广场(Pavilion Kuala Lumpur)对面。发展商为柏威年集团旗下的 Armani Hartajaya Sdn Bhd。共960个单位,从504平方尺单间到1,272平方尺2+1房,67楼设有118米空中泳池。地契为99年租赁地契,至2122年。准证价格为 RM1.3mil 至 RM5.7mil,准证所列预计完工日期为2027年7月。
Key Facts 项目资料
| Developer发展商 | Armani Hartajaya Sdn Bhd (Pavilion Group)Armani Hartajaya Sdn Bhd(柏威年集团) |
| Tenure地契 | Leasehold, 99 years to 4 Oct 2122租赁地契,99年,至2122年10月4日 |
| Title产权类别 | Commercial title; the permit lists the type as condominium商业产权;准证所列类别为公寓 |
| Land土地面积 | About 2 acres (PropertyGuru lists 2.02 acres)约2英亩(PropertyGuru 列为2.02英亩) |
| Status状态 | Under construction; topped out May 2026建设中,2026年5月封顶 |
| Completion完工 | July 2027 (expected, per the advertising permit)2027年7月(广告准证所列预计日期) |
| Total units单位总数 | 960 in a 67-storey residential tower, plus a separate 25-storey office tower960个单位,67层住宅楼;另有一栋独立的25层办公楼 |
| Built-up面积 | 504 to 1,272 sq ft504 至 1,272 平方尺 |
| Price价格 | RM1.3mil to RM5.7mil (permit band)RM1.3mil 至 RM5.7mil(准证价格区间) |
| Nearest rail最近轨道交通 | Bukit Bintang MRT: about 730 m on foot (OpenStreetMap walking route, measured 14 Oct 2026)武吉免登MRT站:步行约730米(OpenStreetMap步行路线,2026年10月14日实测) |
| Foreign buyers外国买家 | Foreign buyers: KL’s usual minimum is RM1 million per unit, with state consent. WhatsApp us to check this project.外国买家:吉隆坡一般最低价为每单位100万令吉,并须获州政府批准。欢迎WhatsApp查询本项目。 |
Want the full picture?想了解完整资料?
Price depends on layout, floor and facing. We send the price list, floor plans and unit positions on WhatsApp.价格视户型、楼层与朝向而定。我们会在WhatsApp发送价格表、平面图与单位位置。
Layouts 户型
| Type户型 | Bedrooms房间 | Size面积 |
|---|---|---|
| A | Studio单间 | 504 sq ft |
| B1 | 1 bed + study1房+书房 | 770 sq ft |
| B2 | 1 bed + study1房+书房 | 772 sq ft |
| C1 | 2 beds2房 | 966 sq ft |
| C2 | 2 beds + study2房+书房 | 978 sq ft |
| C3 | 2 beds + study2房+书房 | 1,100 sq ft |
| C4 | 2 beds + study2房+书房 | 1,272 sq ft |
| D | 3 beds3房 | 1,255 sq ft |
Eight layouts, all from the advertising permit. Unit positions and floor plans: WhatsApp us.共8种户型,资料来自广告准证。单位位置及平面图欢迎WhatsApp索取。
Found a layout you like?看中哪个户型了吗?
Prices depend on layout, floor and facing. WhatsApp us for the exact price of the unit you want and the layouts that fit your budget.价格视户型、楼层及朝向而定。WhatsApp我们,了解心仪单位的确切价格及适合您预算的户型。
Get prices for this layout获取此户型价格Highlights 项目亮点
- Across the road from Pavilion Kuala Lumpur, in the Bukit Bintang shopping belt位于武吉免登购物区,柏威年广场对面
- 118 m infinity pool on Level 6767楼118米无边泳池
- Studio to 3-bedroom layouts, 504 to 1,272 sq ft单间至3房,504至1,272平方尺
- Expected completion July 2027 per the permit准证所列预计完工日期为2027年7月
Facilities 设施
- Level 67 Sky Pool: 118 m infinity pool, kids pool, jacuzzi67楼空中泳池:118米无边泳池、儿童池、按摩池
- Level 63A Sky Wellness (15,000 sq ft): gym, sauna and steam room63A楼空中健康层(15,000平方尺):健身房、桑拿和蒸汽室
- Level 66 Sky Garden: co-working lounge, sunken plaza, viewing deck66楼空中花园:共享办公区、下沉广场、观景台
- Level 12 Courtyard Garden: function rooms, games and entertainment rooms, BBQ deck12楼庭院花园:活动室、游戏及娱乐室、烧烤区
- Residential lobby and drop-off, separate from the office tower住宅大堂及落客区,与办公楼分开
Location & Access 地点与交通
- Jalan Raja Chulan, at the junction with Jalan Bukit Bintang and Jalan Imbi, Kuala Lumpur吉隆坡 Jalan Raja Chulan,与 Jalan Bukit Bintang 及 Jalan Imbi 交界
- Bukit Bintang MRT: about 730 m on foot. We measured OpenStreetMap walking routes from the site pin on Louis’s map (malaysiaproperty4u) to the station’s mapped centre. From EdgeProp’s site pin the same route is about 700 m. The station’s nearest entrance, on Jalan Bukit Bintang near Lot 10, may be closer.武吉免登MRT站:步行约730米。我们以OpenStreetMap步行路线,从 Louis 网站(malaysiaproperty4u)的项目定位点量到车站中心;以 EdgeProp 的定位点计算约700米。Jalan Bukit Bintang 靠近 Lot 10 的出入口可能更近。
- Conlay MRT: about 700 to 830 m on foot to the station’s mapped centre (same method). Entrance B on Jalan Conlay is closer.Conlay MRT站:步行约700至830米(同样方法,量到车站中心),Jalan Conlay 的B出口会更近。
- Pavilion Kuala Lumpur: across the road柏威年广场:马路对面
See it in person亲自去看看
Coming from Singapore? Tell us which day suits you and we will arrange the viewing.从新加坡过来?告诉我们哪天方便,我们为您安排看房。
Who it suits 适合谁
- Buyers who want a Bukit Bintang address with malls, food and nightlife on foot想住在武吉免登、步行就能逛街、吃饭和夜生活的买家
- Owners who plan to rent to city-centre professionals (check the building’s rules on short stays first)打算出租给市中心上班族的业主(短租请先了解大楼规定)
- Singapore and other overseas buyers who want a KL city base (see the foreign-buyer line above)想在吉隆坡市中心有落脚点的新加坡及海外买家(请看上面的外国买家说明)
- Budgets from RM1.3mil预算 RM1.3mil 起的买家
Things to weigh up 需要考虑的地方
- Leasehold: about 96 years left on the lease today租赁地契:目前剩余约96年
- Commercial title: utilities and assessment may be charged at commercial rates商业产权:水电和门牌税可能按商业费率收取
- Portals quote completion from 2027 to 2029; the permit says July 2027, and your SPA date is what binds房产网站的完工日期从2027到2029年不等;准证写2027年7月,以买卖合约日期为准
- Maintenance fee not yet confirmed: ask us管理费尚未确认,欢迎询问
Like to know more about this project?想了解这个项目的更多详情?
WhatsApp us for layouts, floor plans, prices and viewing times.WhatsApp我们,获取户型、平面图、价格及看房时间。
Ask about this project咨询这个项目FAQ 常见问题
What is the price range? 价格范围是多少?
The permit band runs from RM1.3mil to RM5.7mil. WhatsApp us for the price of a specific layout and floor.准证价格为 RM1.3mil 至 RM5.7mil。具体户型和楼层价格欢迎WhatsApp询问。
Is it freehold? 是永久地契吗?
No. It is a 99-year lease that ends on 4 October 2122, as shown on the advertising permit. It is a commercial title.不是。根据广告准证,这是99年租赁地契,到2122年10月4日届满,属于商业产权。
When will it be completed? 什么时候完工?
The advertising permit gives July 2027 as the expected completion date. The tower topped out in May 2026. Portals quote dates up to 2029.广告准证所列的预计完工日期为2027年7月。大楼已于2026年5月封顶,房产网站的说法最晚到2029年。
How far is the MRT? 离MRT多远?
About 730 m on foot to Bukit Bintang MRT, measured on OpenStreetMap walking routes from the site pin to the station’s mapped centre. Conlay MRT is about 700 to 830 m by the same method.以OpenStreetMap步行路线从项目定位点量到武吉免登MRT站中心,约730米。用同样方法量到Conlay MRT站约700至830米。
Can foreigners buy? 外国人可以买吗?
Foreign buyers: KL’s usual minimum is RM1 million per unit, with state consent. WhatsApp us to check this project.外国买家:吉隆坡一般最低价为每单位100万令吉,并须获州政府批准。欢迎WhatsApp查询本项目。
Last checked: 14 Oct 2026. Sources: the KPKT advertising permit filing (hims.kpkt.gov.my), the KPKT TEDUH register as read by Louis (malaysiaproperty4u.com), EdgeProp, PropertyGuru, MyRumahBaru, and our own OpenStreetMap walking measurement. Prices are permit bands, not a price list.最后核对:2026年10月14日。资料来源:房屋及地方政府部广告准证(hims.kpkt.gov.my)、Louis 网站(malaysiaproperty4u.com)整理的 TEDUH 记录、EdgeProp、PropertyGuru、MyRumahBaru,以及我们自己的OpenStreetMap步行测量。价格为准证价格区间,并非价目表。
How do you plan to invest?您打算怎么投资?
Each plan needs a different setup. Airbnb usually needs fuller renovation and styling, long-term rental can work with simple furnishing, and co-living is set up room by room. WhatsApp us and we will share what suits this project and your budget.不同的投资方式需要不同的准备:Airbnb通常需要较完整的装修与布置,长租只需简单家具即可,合租(co-living)则按房间规划。欢迎WhatsApp我们,我们会分享适合这个项目和您预算的做法。
Location位置
Open in Google Maps在Google地图打开
Walk to Bukit Bintang MRT步行到武吉免登MRT站
Bukit Bintang MRT: about 730 m walk (measured walking route). Source: OpenStreetMap walking route (routing.openstreetmap.de foot), from the site pin on Louis's map (3.149216, 101.715247) to the station's mapped centre, 14 Oct 2026. EdgeProp's site pin gives about 700 m..武吉免登MRT站:步行约730米(实测步行路线)。来源:OpenStreetMap walking route (routing.openstreetmap.de foot), from the site pin on Louis's map (3.149216, 101.715247) to the station's mapped centre, 14 Oct 2026. EdgeProp's site pin gives about 700 m.。
Walking directions in Google Maps ↗用Google地图查看步行路线 ↗ · More projects in Bukit Bintang & TRX武吉免登与TRX的更多项目 · All Kuala Lumpur projects吉隆坡全部项目