Short answer: from 2027 you will reach RTS Bukit Chagar on foot, by bus, by taxi or by a ride dropped off nearby, not by driving your own car to the door. Jalan Jim Quee closes to private vehicles from 2027, e-hailing moves to Jalan Tun Razak, and public parking is planned outside the zone, including a site in front of Hospital Sultanah Aminah with shuttle buses (The Star, 19 Sep 2026). A 400 m covered bridge to JB Sentral and City Square is being built, and an RM60m bridge to the KTM Komuter station has been approved.简短回答:2027年起,你会步行、搭巴士、搭德士或在附近下车进入武吉查卡RTS站,而不是自己开车到门口。Jalan Jim Quee 自2027年起禁止私家车进入,网约车改在 Jalan Tun Razak 上下客,公共停车场计划设在管制区外,包括苏丹娜阿米娜医院前的一块地,并有接驳巴士(The Star,2026年9月19日)。一条通往JB Sentral和City Square的400米有盖天桥正在兴建,另一条通往KTM通勤火车站、耗资6000万令吉的天桥已获批准。
Who this is for: anyone buying near the station, and anyone who plans to drive to the RTS.适合谁:在车站附近买房的人,以及打算开车去RTS的人。
Opening: passenger service is expected in February 2027, subject to safety certification and approval by both governments (joint statement, 2 Oct 2026).通车:预计2027年2月开始载客,须先通过安全认证并获两国政府批准(2026年10月2日联合声明)。
Still unknown: the fare, the exact bridge locations and dates, and parking capacity and charges.仍未公布:票价、天桥的确切位置和日期、停车位数量和收费。
Last checked 14 Oct 2026最后核对:2026年10月14日
Where exactly is the station?车站到底在哪里?
RTS Bukit Chagar is on Jalan Tun Abdul Razak in Bukit Chagar, next to the Bangunan Sultan Iskandar CIQ, JB Sentral and City Square. Immigration for both countries is cleared at the departure station, and the ride to Woodlands North takes about 5 minutes. The station building and its CIQ are physically complete and in testing (Malay Mail, 18 Aug 2026).武吉查卡RTS站位于武吉查卡的 Jalan Tun Abdul Razak,旁边就是苏丹依斯干达大厦(BSI)关卡、JB Sentral 和 City Square。两国出入境都在出发站办理,到兀兰北车程约5分钟。车站大楼和关卡设施已完工,正在测试(Malay Mail,2026年8月18日)。
Want to live near the RTS?想住在RTS附近?
We measure the walk and drive to the RTS and CIQ for every project.每个项目到RTS与关卡的步行与车程,我们都实测过。
Which bridges are built, approved or proposed?哪些天桥已建成、已批准或只是拟建?
This is the part that decides how long your walk will be. We group every link by its status today.这一部分决定你要走多远。我们把每条连接按目前状态分组。
| Link连接 | Status (14 Oct 2026)状态(2026年10月14日) | What we know已知资料 | Source来源 |
|---|---|---|---|
| JB Sentral to the BSI CIQJB Sentral 至 BSI 关卡 | Built, in use已建成,使用中 | The existing covered link between the railway station and the checkpoint building.火车站与关卡大楼之间现有的有盖连接。 | OpenStreetMapOpenStreetMap |
| R&F Mall to the CIQR&F Mall 至关卡 | Built, in use已建成,使用中 | A sheltered link bridge of about 650 m from R&F Mall to the CIQ.从 R&F Mall 到关卡约650米的有盖连接桥。 | The Iskandarian, Aug 2024 |
| 400 m covered bridge on Jalan Tun Abdul RazakJalan Tun Abdul Razak 上的400米有盖天桥 | Under construction兴建中 | Links the RTS station, the CIQ, JB Sentral and City Square, with travelators. No completion date published.连接RTS站、关卡、JB Sentral 和 City Square,设有自动人行道。完工日期未公布。 | The Independent SG, Jun 2026 |
| Pedestrian bridges around the station车站周边行人天桥 | Being built in stages分阶段兴建 | Most due by end-2026, the rest in 2027. The city council (MBJB) will publish a video with the bridge locations and timeline.多数预计2026年底完成,其余在2027年。新山市政厅(MBJB)将发布影片,说明天桥位置和时间表。 | The Star, 19 Sep 2026 |
| RTS station to the KTM Komuter stationRTS站至KTM通勤火车站 | Approved已批准 | RM60m, about 12 months to build, carried out by the Transport Ministry. Komuter passengers will reach the RTS without going through JB Sentral. Start date not announced.耗资6000万令吉,工期约12个月,由交通部执行。通勤火车乘客可直达RTS站,不必经过JB Sentral。动工日期未公布。 | Malay Mail, 18 Aug 2026 |
| Links from individual projects个别项目的连接 | Proposed or approved, per the developers发展商称拟建或已批准 | See the next table. These are the developers’ plans and can change.见下表。这些是发展商的计划,可能会变。 | Our project pages本站项目页 |
Links the developers quote发展商所称的连接
These figures are from our project pages. They are the developers’ figures, and most rely on a link that is not built yet. Until it is, the walk today can be longer.以下数据来自本站项目页,都是发展商的数据,多数取决于尚未建成的连接。建成之前,现在实际步行可能更远。
| Project项目 | Link the developer quotes发展商所称的连接 | Status状态 |
|---|---|---|
| Coronade TwinsCoronade Twins | About 210 m to the RTS and 250 m to JB Sentral/CIQ via link bridges POB 1 and POB 2经连接桥 POB 1 和 POB 2,到RTS约210米,到JB Sentral/关卡约250米 | Proposed拟建 |
| Aethera ResidencesAethera Residences | About 400 m to the RTS by covered walkway经有盖走道到RTS约400米 | Developer figure发展商数据 |
| Causewayz SquareCausewayz Square | Link bridge about 600 m to the CIQ, 400 m to the mall连接桥到关卡约600米,到商场约400米 | Approved, per the developer发展商称已获批 |
| Gen SphereGen Sphere | Direct connection to the existing link bridge; about 440 m to JB Sentral直通现有连接桥;到JB Sentral约440米 | Proposed (terms apply)拟建(附条件) |
| GenRiseGenRise | Covered walkway to the link bridge to JB Sentral; about 720 m to JB Sentral/CIQ, 980 m to the RTS有盖走道连接通往JB Sentral的天桥;到JB Sentral/关卡约720米,到RTS约980米 | Proposed拟建 |
| R&F Princess Cove Phase 3R&F Princess Cove Phase 3 | Link bridge to R&F Mall; about 650 m to the CIQ连接桥直通 R&F Mall;到关卡约650米 | Developer figure发展商数据 |
What changes on the roads?道路有什么变化?
- Jalan Jim Quee closes to private vehicles from 2027. Only buses, taxis and officers working at the CIQ complex may enter. The aim is to keep traffic moving once the RTS opens (The Star, 19 Sep 2026).2027年起 Jalan Jim Quee 禁止私家车进入。只有巴士、德士和在关卡大楼工作的官员可以进入,目的是RTS通车后保持交通顺畅(The Star,2026年9月19日)。
- E-hailing moves to Jalan Tun Razak. Plan your pick-up and drop-off there.网约车改在 Jalan Tun Razak 上下客。请把上下车地点定在那里。
- Bus lanes are being considered at several key spots, says the state.州政府正在考虑在几个重点地段设巴士专用道。
- More buses: the Stage Bus Service Transformation 2.0 plan adds at least 200 new buses from housing areas around JB to Bukit Chagar, timed with the RTS opening. The operator award is still being finalised (Malay Mail, 18 Aug 2026).更多巴士:巴士服务转型计划2.0将新增至少200辆巴士,从新山各住宅区开往武吉查卡,配合RTS通车。营运商合约仍在敲定中(Malay Mail,2026年8月18日)。
Where can you park?可以在哪里停车?
Not on Jalan Jim Quee. The state plans parking outside the restricted area, including a site in front of Hospital Sultanah Aminah. Shuttle buses will link these car parks to the CIQ complex. Capacity, charges and opening dates have not been announced (The Star, 19 Sep 2026).不能停在 Jalan Jim Quee。州政府计划在管制区外设停车场,包括苏丹娜阿米娜医院前的一块地,并以接驳巴士连接停车场和关卡大楼。车位数量、收费和启用日期都还没公布(The Star,2026年9月19日)。
If you plan to drive to the RTS every day, factor in the shuttle from the car park. This is one reason buyers look at homes they can walk from, or at projects with their own shuttle.如果你打算每天开车去RTS,要把停车场接驳巴士的时间算进去。这也是买家考虑步行可达的房子,或自带接驳车项目的原因之一。
What does this mean for each area group?对各区域分组有什么影响?
| Group分组 | How you will likely reach the RTS可能的进站方式 | What to ask before you buy买房前要问的 |
|---|---|---|
| Walk to CIQ & RTS步行到关卡与RTS | On foot, via the bridges above.步行,经上述天桥。 | Which bridge your tower uses, and whether it is built, approved or only proposed.你那栋楼用哪条天桥,它是已建成、已批准还是只是拟建。 |
| Within 10 km of CIQ & RTS距关卡与RTS 10公里内 | Project shuttle, the new buses, or a drop-off on Jalan Tun Razak.项目接驳车、新巴士,或在 Jalan Tun Razak 下车。 | Whether the shuttle runs now or is only planned, and where it stops after Jalan Jim Quee closes.接驳车是已在运行还是只是计划,Jalan Jim Quee 封路后停在哪里。 |
| Further out较远区域 | Drive, park outside the zone, then the shuttle; or the new bus routes.开车到管制区外停车,再搭接驳巴士;或搭新巴士路线。 | Door-to-gate time at your usual hour.你平时出门时间的门到闸口时间。 |
Projects where access matters most最受进站方式影响的项目
Coronade Twins @ Coronation Square
Freehold serviced residences 210m from the RTS via a proposed link bridge
- Price价格
- From RM4XXK to RM9XXK≈ from S$1XXK to S$2XXK
- Completion完工
- 2030
- Layouts户型
- 1 Bedroom, 2 Bedrooms, 3 Bedrooms
- Access交通
- The developer quotes about 210 m to the RTS and 250 m to JB Sentral/CIQ via proposed link bridges
- Foreigners外国买家
- From RM600KRM600K 起
Why we recommend this project here推荐理由
The shortest developer-quoted walk to the RTS, about 210 m, once the proposed link bridges are built.发展商所称到RTS的步行距离最短,约210米,须等拟建连接桥建成。
Aethera Residences
52-storey freehold residence by UOA with rooftop sky pools, 400m covered walkway to the RTS
- Price价格
- From RM6XXK to RM2.8mil≈ from S$1XXK to S$8XXK
- Completion完工
- 2030
- Layouts户型
- 1 Bedroom, 2 Bedrooms, 3 Bedrooms, 4 Bedrooms, Dual-key
- Access交通
- The developer quotes about 400 m to the RTS by covered walkway
- Foreigners外国买家
- From RM700KRM700K 起
Why we recommend this project here推荐理由
The developer quotes about 400 m to the RTS by covered walkway, on Jalan Tun Abdul Razak.位于 Jalan Tun Abdul Razak,发展商称经有盖走道到RTS约400米。
CTC SkyOne @ Bukit Chagar
Freehold dual-key and triple-key serviced apartments, about 300m from the RTS
- Price价格
- From RM6XXK to RM1.2mil≈ from S$1XXK to S$3XXK
- Completion完工
- 2030
- Layouts户型
- 2 Bedrooms, 3 Bedrooms, 4 Bedrooms, Dual-key
- Access交通
- About 300m to RTS Bukit Chagar
- Foreigners外国买家
- From RM500KRM500K 起
Why we recommend this project here推荐理由
About 300 m to the RTS on our page. Ask us which bridge your tower will use.本站资料距RTS约300米。你那栋楼用哪条天桥,可以问我们。
Gen Sphere
Freehold serviced apartments minutes from JB Sentral and the RTS Link
- Price价格
- From RM5XXK to RM8XXK+≈ from S$1XXK to S$2XXK
- Completion完工
- 2028
- Layouts户型
- 1 Bedroom, 2 Bedrooms, 3 Bedrooms, Dual-key
- Access交通
- About 440m to JB Sentral
- Foreigners外国买家
- From RM600KRM600K 起
Why we recommend this project here推荐理由
A proposed direct connection to the existing link bridge; the developer quotes about 440 m to JB Sentral.拟建直通现有连接桥的通道;发展商称到JB Sentral约440米。
Tell us where you work in Singapore and when you leave home. We will map your door-to-gate route for any project on our site.告诉我们你在新加坡哪里上班、几点出门。我们会为本站任何项目规划从家门到闸口的路线。
Questions buyers ask买家常问
Can I drive to RTS Bukit Chagar and park there?我可以开车到武吉查卡RTS站并在那里停车吗?
Not on Jalan Jim Quee, which closes to private vehicles from 2027. The state plans car parks outside the zone, including one in front of Hospital Sultanah Aminah, with shuttle buses to the CIQ complex.不能停在 Jalan Jim Quee,那里2027年起禁止私家车进入。州政府计划在管制区外设停车场,包括苏丹娜阿米娜医院前的一处,并有接驳巴士到关卡大楼。
Is there a bridge from JB Sentral to the RTS station?JB Sentral 有天桥通往RTS站吗?
A 400 m covered bridge on Jalan Tun Abdul Razak linking the RTS station, the CIQ, JB Sentral and City Square is under construction. No completion date has been published.一条位于 Jalan Tun Abdul Razak、连接RTS站、关卡、JB Sentral 和 City Square 的400米有盖天桥正在兴建,完工日期尚未公布。
Can I take the KTM Komuter to the RTS?可以搭KTM通勤火车去RTS吗?
Yes, through JB Sentral today. An RM60m bridge straight from the Komuter station to the RTS station has been approved and takes about 12 months to build. The start date has not been announced.可以,目前经JB Sentral。一条从通勤火车站直通RTS站、耗资6000万令吉的天桥已获批准,工期约12个月,动工日期尚未公布。
When does the RTS open, and how much is the fare?RTS什么时候通车?票价多少?
Passenger service is expected in February 2027, subject to safety certification and approval by both governments. The fare has not been announced. Malaysia and Singapore will announce it together.预计2027年2月开始载客,须先通过安全认证并获两国政府批准。票价尚未公布,将由马新两国共同宣布。
Will walk times change when the bridges open?天桥启用后步行时间会变吗?
Yes, for many projects they should get shorter. We show the figures on each project page as they stand and label developer figures. We will re-check them when the station opens.会。许多项目的步行时间应该会缩短。我们在各项目页照现有数据列出,并注明哪些是发展商数据。车站启用后会重新核对。
See also: condos near RTS Bukit Chagar · condos with a shuttle to the CIQ or RTS · new launches, October 2026延伸阅读:武吉查卡RTS附近公寓 · 有接驳车往关卡或RTS的公寓 · 2026年10月新盘
Sources资料来源
- The Star: JB road will close to private vehicles (Jalan Jim Quee, bridges, parking) (19 Sep 2026)The Star:新山 Jalan Jim Quee 将禁止私家车进入(天桥、停车)(2026年9月19日)
- Malay Mail (Bernama): RM60m bridge to give Komuter passengers direct access to the RTS station (18 Aug 2026)Malay Mail(Bernama):6000万令吉天桥让通勤火车乘客直达RTS站(2026年8月18日)
- The Independent Singapore: 400 m sheltered walkway to link the RTS station, CIQ, JB Sentral and City Square (23 Jun 2026)The Independent Singapore:400米有盖天桥连接RTS站、关卡、JB Sentral 和 City Square(2026年6月23日)
- The Iskandarian: R&F Princess Cove link bridge now open (650 m sheltered link from R&F Mall to the CIQ) (27 Aug 2024)The Iskandarian:富力公主湾连接桥启用(R&F Mall 至关卡650米有盖连接桥)(2024年8月27日)
- The Star: RTS Link to start operations in February 2027 (2 Oct 2026)The Star:RTS捷运预计2027年2月投入运营(2026年10月2日)
- Wikipedia: Bukit Chagar RTS station (address and connections) (checked 14 Oct 2026)维基百科:武吉查卡RTS站(地址与连接)(2026年10月14日查阅)
Last checked 14 Oct 2026. Facts are in our own words, with the date of each report. Project links are as the developers quote them on our project pages.最后核对:2026年10月14日。内容由我们自行撰写,并注明每篇报道日期。项目连接照本站项目页上发展商的说法。
Next step下一步
Ask us on WhatsApp. No obligation.在WhatsApp问我们,无需承诺。
Leave a Reply